Malaysia, 2023/2024 – Oil platform 

Off the coast of Malaysian Borneo, an oil rig tipped over in 2021 and embedded itself 100m deep underwater. The project to clean up this platform began in 2023. The Corporate Travel Clinic was asked for the medical supervision both above and below water. This project is expected to be completed by the end of 2024.

In 2021, the Naga7 drilling platform tipped over and plunged 100m deep underwater. The project to clean up this platform began in 2022. To illustrate, the platform has the height of the Eiffel Tower. The Corporate Travel Clinic was asked for medical guidance both above and below water. This project started in early 2023 and will last until the end of 2024.

Healthcare Consultation

  • Medical audit on location to determine the level of local healthcare
  • Medical support 24/7
  • Dive medical support 24/7

Healthcare Deliverables

  • Medical staff